“Ships generate revenue while in motion!” This principle drives shipping companies, which is why they seek to unload and load their ships as quickly as possible in ports. Achieving this goal requires modern infrastructure, advanced safety equipment, and optimized process management. Exir Shimi Terminal, utilizing ten pipelines that connect storage tanks to P3 and P4 docks, enables the simultaneous unloading and loading of two ships.
Ship Loading and Unloading of Diesel, Light Hydrocarbons, and Solvents
Exir Chemical Terminal is fully equipped and ready to handle the Ship loading and unloading of diesel, light hydrocarbons, and various solvents. With multiple pipeline connections to berths P3 and P4, the terminal enables fast, safe, and reliable transfer of products. Supported by advanced infrastructure, specialized port equipment, and strict adherence to international safety and environmental standards, Exir Chemical Terminal offers efficient and dependable logistics services to both domestic and international clients.
Features of Ship Loading and Unloading Facilities
Exir Shimi Terminal, equipped with well-developed infrastructure including pipelines, high-power pumps, and dockside loading facilities, as well as modern technologies such as mass flow meters, ensures ship unloading and loading with exceptional speed and precision. Some key features of this system include:
- Loading rate of up to 1,000 tons per hour
- Simultaneous ship loading via four pipelines
- Capability of pigging and line clearing before and after ship loading or unloading
Main Specifications of Mahshahr Docks
Effective dock depth: 25 meters
Dock length: 200 meters
Ship Unloading and Loading Process at Exir Shimi Terminal
Step 1: Docking and Pipeline Connection
- Upon arrival at docks P3 and P4, ships are guided by operational experts to dock in the correct position.
- Pipelines are connected to the ship’s inlet and outlet systems, and necessary tests are conducted to ensure there are no leaks and that pressure levels are optimal.
Step 2: Commencement of Unloading or Loading
- After safety approval, the unloading of materials from the ship to storage tanks or loading from storage tanks to the ship begins.
- Automated monitoring systems continuously track flow rate, pressure, and temperature to ensure an optimal and safe process.
Step 3: Completion of Operations and Pipeline Disconnection
- Once the operation is complete, pipelines are carefully cleaned and secured to prevent contamination or unwanted chemical reactions.
- The ship is then prepared to depart from the dock, and the next operation is scheduled.
Advantages of the Unloading and Loading System at Exir Shimi Terminal
✅ Increased operational speed and reduced ship waiting time: The ability to simultaneously load and unload two ships minimizes delays and enhances terminal efficiency.
✅ Maximum safety with advanced technologies: The use of gas sensors, leak detection systems, and fire suppression equipment ensures the safety of personnel and the environment.
✅ Minimizing material loss and environmental pollution: The use of durable pipeline materials and nitrogen blanketing systems prevents the evaporation and leakage of chemical liquids.
✅ Flexibility in handling different cargo types: The ability to transfer multiple types of chemical materials simultaneously without cross-contamination or mixing improves terminal efficiency.